Thursday, 21 February 2013

Lumut Power Plant - Where It Begins......

The new blog is under its way.. to start with.. here is something  about Lumut Power Plant...


  • Situated at Segari, Perak, consist of 3 blocks of CCGT power trains with total capacity up to 1943MW; 2 blocks owned by SEV (1303 MW) and 1 block by GB3 (640MW).


  • Commercial Operation Date:  
  • Block 1 – 1/7/96 ,
  • Block 2 – 1/7/97 , 
  • Block 3 – 16/11/02
  • Built under turnkey supplier; Alstom provides components and services .
  • Total cost about RM3.6 billion(SEV) + RM1.6 billion(GB3)
  • Owned by Malakoff Corporation Berhad & 
  • Operated by Malakoff Power (previously known as Teknik Janakuasa)
  • The power plant is the home to about 500 workers. 

  • Full Address:
Lumut Power Plant, Off Highway 60, 
Daerah Manjung, Persiaran Segari. 
Segari. Perak. 32200. 
Malaysia. 

  • Telephone: 05-6774567